Delta Hydro Engineers (Pty) Ltd
A Highveld urban catchment with water flowing through a concrete-lined drainage channel after a summer thunderstorm.

Gauteng

Stormwater Management Plans in Johannesburg

Stormwater management plans for municipal approval: attenuation and outlet sizing, overflow paths, WSUD and maintenance schedules that contractors can price.

Talk to an engineer

Johannesburg · -26.2041, 28.0473 · WGS84

How we help in Johannesburg

SMPs bridge layout, hydraulics, and land-use conditions so approvals align with municipal policy and NEMA considerations. Section 38 of the by-laws caps post-development peaks for the 5- to 25-year storms at pre-development levels. The Johannesburg Roads Agency requires on-site attenuation on land over 8 500 m², and no attenuation pond may sit below the 50-year floodline.

North of the Witwatersrand ridge, the Jukskei, Braamfontein Spruit and Klein Jukskei drain to the Crocodile River; south of it, the Klipspruit and Klip River drain Soweto and the southern suburbs to the Vaal. Our Johannesburg guide covers the rivers, recent floods and local rules in more detail.

When do you need this?

  • Greenfield precincts and large-scale redevelopments
  • Industrial and logistics sites with concentrated impervious coverage
  • Sites discharging to sensitive wetlands or estuaries
  • Municipal pre-application or approval conditions requiring an SMP

Full service detail

Methodology, deliverables, standards, and FAQs are maintained on the national service page—updated as regulations and municipal guidance evolve.

Read: Stormwater Management Plans in South Africa →

Related services in Johannesburg

Further reading

Ready to brief a study?

Contact Delta Hydro

Exploring in-house analysis? See deltahydro.tech .