What is hydraulic modelling?
Hydraulic modelling translates flows into depths, velocities, and inundation extents using 1D/2D solvers—so decisions can be based on quantified water behaviour.
Solver choice with a purpose
We avoid defaulting to 2D where 1D answers the question faster and cleaner—or vice versa. Mesh extent, roughness domains, and boundary locations are chosen against failure modes (afflux, embankment overtopping, tailwater sensitivity) the brief cares about, whether that is a SANRAL road-crossing check or a SANCOLD-aligned dam safety review.
QA reviewers can follow
Peer review packs include geometry provenance, scheme settings, and mass balance sense checks so reviewers spend time on engineering judgement, not reverse-engineering the build.
What we typically need from you
- Design flows, lateral hydrographs, or stage hydrographs from hydrology (native formats if available)
- Topo surveys, cross-sections, structures, and roughness classes with source notes
- Boundary conditions downstream (tailwater rules, tide, rating curves) agreed with stakeholders
- Review expectations (1D vs 2D, mesh independence, animation needs) from the brief
Where we add technical depth
- Explicit 1D/2D scoping tied to the questions the model must answer
- Calibration and stability artefacts packaged for independent technical review
- Scenario matrices for structures, blockage, and climate sensitivities when required
- Maps and time series tuned for planning overlays, dam safety files, or legal disclosure
When do you need this?
- Flood inundation mapping for planning and safety cases
- Bridge and culvert hydraulic performance and afflux
- Dam break and downstream routing studies
Our approach
-
Model purpose
Define the questions the model must answer and choose 1D vs 2D accordingly.
-
Build & calibration
Construct geometry, roughness, and boundary conditions; calibrate where data exists.
-
Scenario testing
Run design and sensitivity events; capture depths, velocities, and hazard metrics.
-
Quality assurance
Peer review pack with mesh/scheme decisions and stability checks.
What you'll receive
- Modelling report
- Maps and time-series results
- Model files (as agreed)
Relevant SA standards
- SANRAL hydraulic checks (road contexts)
- SANCOLD / dam safety contexts where applicable
FAQ
How do you choose between HEC-RAS and MIKE?
Selection depends on terrain, solver needs and client preferences, measured against the questions the model must answer. The modelling report records the choice and the mesh and scheme decisions behind it.
Can you model bridges inline?
Yes—including piers, scour-sensitive reaches, and afflux constraints.
Do you provide mesh independence studies for 2D?
Where required by the brief, we document sensitivity to mesh resolution.
Does 2D modelling take longer?
Larger 2D domains take longer, and the schedule depends on extent and data quality. We use 2D where flow spreads, splits or ponds, 1D where the watercourse is confined, and often couple the two: the channel in 1D, the floodplain in 2D.
Author
Stephan DreyerAreas we serve
We work on projects across South Africa — see locations.
Related services
Related reading
- DEM and LiDAR Accuracy: Why Terrain Data Makes or Breaks a Flood Model
- Choosing Between 1D and 2D Flood Modelling for Your Project
- Bathymetric Surveys: Mapping What's Under the Water (and Why Models Depend on It)
- Berms, Levees and Flood Walls Next to Rivers: When Are They Legal?
- Bridge Waterway Assessments: Afflux, Freeboard and Scour Explained
- Building a National Flood Hazard Map: What Goes Into It
- Between the 1:50 and 1:100-Year Floodlines: What Each Municipality Allows
- Coastal Management Lines: What the ICMA Means for Building Near the Sea
- What We Find When We Inspect Culverts: Common Defects That Quietly Erase Capacity
- How Culvert Sizing Works (and Why "Just Add Another Pipe" Fails)
- Defending flood claims with independent hydraulic modelling
- Filling in a Floodplain: Compensatory Storage and Why the Floodline Moves
- What Is a Floodline Certificate, and When Does a Municipality Ask for One?
- Low-Level River Crossings: Designing for Overtopping, Debris and Safety
- Post-Event Loss Modelling: From Flood Footprint to Portfolio Impact
- Pre- vs Post-Development Floodlines: Which One Does Your Municipality Want?
- Property-Level Flood Scoring vs Catchment-Scale Hazard Layers: When Does Each Matter?
- How QGIS Plugins Accelerate Hydrological Workflows
- The Regulated Area of a Watercourse: When You Need a Section 21(c) and (i) Authorisation
- Reinsurance-Grade Flood Loss Models in South Africa: What That Requires
- How a New Road Crossing Changes Your Floodline
- Section 144 of the National Water Act: The 1:100-Year Floodline on Township Plans
- Temporary Works in Rivers and Floodplains: What Needs Authorisation
- How Old Can a Floodline Be? Why Floodlines Go Out of Date
Ready to get started?
Contact us